Once you have selected a solar retailer (read our article: Checklist of things you should look for when choosing your solar company) and your system has been designed and pre-approved (if applicable- read our article: Solar capacity pre-approval), the installation can start. The installation as such takes up to 3 weeks depending on the size of your system and the weather conditions.
Now that you have brand new solar panels on your roof, it is time to enjoy the sun and start saving, right? Well, not just yet…
1- Inspection
Once the panels are installed, the next step is the electrical inspection. Your installer sends a Certificate of Electrical Safety to the Energy Safe Victoria and arranges an inspection. This inspection must be carried out by a relevant state electrical authority within 10 days of installation.
2- Meter upgrade
Following this inspection, your installer sends the required document to your electricity retailer. The retailer will notify your distributor to change your meter. If you have a traditional meter, it needs to be replaced with a smart meter. Smart meters make it possible to record the energy you will export to the grid or the electricity you will import from the grid.
This process will occur within 3 weeks after the retailer has lodged the required documents from the electrical inspection.
3- Start saving!
Once the new meter is installed, your system is ready to be switched on!
4- Maintenance
Once your system is up and running it is important to make sure it is working at its optimal performance. Even if your solar system requires very little maintenance, you’ll find here our Maintenance tips for your solar panels.
As you can see, installing solar is not only about putting panels on the roof! The process involves paperwork and we know how confusing it can be. That’s why Energis offers an end-to-end approach to make it smooth and easy for you. For further information, contact us on 13 782 217 or via email on contactus@energis.com.au